Jake and the team transformed the back of our 1930s semi. Steel install, kitchen knock-through and full re-plaster done in 11 weeks, exactly the date he gave us at quote stage. Building Control signed off first visit. Honest pricing, no surprise invoices.
Verified homeowner reviews
What Greater Manchester homeowners say.
Every review below is from a completed Renovo project, extensions, lofts, structural work, full renovations. Names, locations, dates and scopes intact.
We'd had three quotes that all came back vague. Renovo's was the only one that itemised materials, labour and contingency. Loft was watertight in 8 days, full conversion done in 9 weeks. Two of the neighbours have used them since.
Tricky build on shallow Victorian footings. Jake brought a structural engineer to the survey, designed proper underpinning and we got planning and Building Control through without a single revision. Site was spotless every Friday.
Big project, 60 sqm wrap-around, new kitchen, knocked through to dining room. The fixed-price quote held. Day-by-day programme. We added a downstairs WC mid-build and they handled the variation with proper paperwork rather than 'we'll sort it'.
Complete strip-out, rewire, replumb, re-roof, new kitchen and two bathrooms. 16 weeks, came in £2k under quote because the joists were better than expected and Jake refunded the contingency instead of pocketing it. Almost unheard of.
Smallest job they took on that month, never felt like it. Insulation, new floor, full electrical, painted and finished in 18 days. Felt like a proper extension, not a cold tacked-on room.
Old slate roof was lifting. They stripped it, replaced damaged rafters, fitted breathable membrane and re-slated in 6 days. Scaffold up and down before the weather turned. Manufacturer guarantee on the slate passed straight to me.
Took on a job two other builders had walked away from, odd-shaped plot, rear of a terrace. Came up with a design that opened the back wall fully and bounced light through. Build was 10 weeks, immaculate finish. Worth every penny.
Specialist job, partial underpinning to lower the floor and tank the basement. Engineer-led design, sequential underpinning done properly with Building Control inspections at every stage. New living room down there now. No damp, no drama.
Be next on this page
Same standard of work. Same fixed-price guarantee. Yours next.
Tell us about the project. We’ll come out within 7 days and return a written quote inside 48 hours of the visit.
